post 3 of 10

Prev Next Main page

Want to be remembered? Sign in to your account or create a guest account by clicking on the link at the top of the page.
Title:
Add attachment
Note: Long posts may be split by inserting the {more} tag.
Optional tags:
Tags can be used to categorize a post. Use a comma to separate multiple tags in a list.

Preview

Friday, May 18, 2012

Updated Concepts - Auke Lake Campus

3.3a Clearing Concept
3.3a Clearing Concept
3.2 Greenway Concept
3.2 Greenway Concept
Greenway Concept 3-2a - UAS Juneau Campus, Auke Lake
Uploaded:Fri May 18 16:28:14 2012
File size:635251 bytes
Clearing Concept 3-3a - UAS Juneau Campus, Auke Lake
Uploaded:Fri May 18 16:28:14 2012
File size:548231 bytes

 

 

 

 

Attached are refined concepts for UAS Auke Lake Campus based on faculty, student and staff comments and feedback given during the Perkins+Will visit May 9-11, 2012.  

  • 3.2a Greenway Concept
  • 3.3a Clearing Concept

Four potential sites for a  freshman dorm on campus are currently under consideration.  Two potential housing sites are shown on each  of the concepts.   A final site will be selected within the next month, and the master plan will move forward with one site selected by UAS.   Once a site is selected, the design for the new freshman dorm will begin; construction is anticipated to start in 2013.  


Comments

     
#1 Posted by Michael Hekkers on Monday, May 21, 2012 at 09:57 AM
     

I like the primary central location of the freshman student housing in the Clearing Concept. 


Preview:
Add a Comment
Want to be remembered? Sign in to your account or create a guest account by clicking on the link at the top of the page.
Add attachment