UAS FH Construction Sep 20

Construction Update for 9/20/2013

The contractor has striped the forms of the concrete foundation walls for the Freshman Residence Hall I.  Ventilation Ducts, Plumbing and Electrical conduits will be run inside the foundation area and then it will be filled in with shot rock.  Then a concrete slab will be poured over the whole thing forming the first floor of Hall I. 

2013 09-20
2013 09-20
2013 09-20 Area to be filled with Rock
2013 09-20 Area to be filled with Rock

 