post 65 of 81

Prev Next Main page

Want to be remembered? Sign in to your account or create a guest account by clicking on the link at the top of the page.
Title:
Add attachment
Note: Long posts may be split by inserting the {more} tag.
Optional tags:
Tags can be used to categorize a post. Use a comma to separate multiple tags in a list.

Preview

Wednesday, October 15, 2014

Lights Out Tonight (Oct 15)

Lighting Outage Tonight

There will be no lights in the parking lot and along Auke Lake way tonight October 15, 2014.  The Contractor that has installed the new LED lights on campus has removed the old control cabinet and is installing the new control cabinet.  This is a two day job and there is no practical way to make a temporary power connection. 

New Lighting Control Panel.

 Control Pannel 

 

 

All of the UAS parking lots will be dark tonight in addition to the road and sidewalk coming into campus.  The Noyse Pavilion and the parking lot lights in front of the new Freshman Housing and the new pathway lights between the parking lot and the Soboleff building are all fed from this control panel and will be off tonight.  The courtyard, corridor and chapel by the lake shared parking lot are not affected by this project and will have lights.  Lights will be back on tomorrow night.  We apologize for the involving this will cause everyone here at UAS.  If we are very lucky the clouds will dissipate and we will be able to see the Aurora display that has been very active the past 36 hours.

The UAS Site lighting project will be constructed under two separate phases as shown on the figure below.  Phase II is scheduled for construction during the summer of 2015.

 Lighting Phases 

 

 

 

 

Preview:
Add a Comment
Want to be remembered? Sign in to your account or create a guest account by clicking on the link at the top of the page.
Add attachment

Weblog Archives